Ads
related to: shell method with hole in ground pipe design for concrete patio system
Search results
Results From The WOW.Com Content Network
In 1971, several Binishells were constructed in Australia, for a governmental initiative that required rapid building system for multi-purpose centers. [5] Bini also completed the construction of a tourist village in Cairns, Australia, using Minishells in 1980. [4] More recently the system is being re-launched by Dante Bini's son Nicoló Bini, AIA.
The concrete plug is driven into the ground by the drop hammer. The pipe is also dragged into the ground due to friction developed between the steel and the concrete. [1] [4] [5] [6] When the desired depth is reached, the pipe is held in position by leads—structures which guide and align the pile and hammer. [7]
The Shell pavement design method was used in many countries for the design of new pavements made of asphalt. [1] First published in 1963, [2] it was the first mechanistic design method, providing a procedure that was no longer based on codification of historic experience but instead that permitted computation of strain levels at key positions in the pavement.
He was able to design a unique pneumatic formwork using a huge low-pressure balloon. [3] This technique was patented in 1964. [6] An example of the shell-structure Dante Bini built for a public works initiative by the Australian government. In July 1965, he was able to lift his first concrete shell near Bologna. It was a sphere with a 12-meter ...
A post-hole auger. An earth auger, earth drill, or post-hole auger is a drilling tool used for making holes in the ground. [1] It typically consists of a rotating vertical metal rod or pipe with one or more blades attached at the lower end, that cut or scrape the soil.
Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.
Modern screw pile design is based on standard structural and geotechnical principles. Screw pile designers typically use their own design software which has been developed through field testing of differing compression pile and tension anchor configurations in various soil profiles. Corrosion is addressed based on extended field trials ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...