When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Submittals (construction) - Wikipedia

    en.wikipedia.org/wiki/Submittals_(construction)

    The submittal process gives another level of detail usually not included as part of the design documents. An "approved" submittal authorizes quantity and quality of a material or an assembly to be released for fabrication and shipment. It ensures that the submittals have been properly vetted before final ordering.

  3. Shop drawing - Wikipedia

    en.wikipedia.org/wiki/Shop_drawing

    Quick review is essential during the approval process. [4] Any method that facilitates this, while providing ample opportunity for comment and complete distribution, should be considered. Although a procedure may be specified in the contract drawings, most architects and engineers are open to suggestions and innovations that speed up the process.

  4. Product certification - Wikipedia

    en.wikipedia.org/wiki/Product_certification

    product certifications (many nations) Product certification or product qualification is the process of certifying that a certain product has passed performance tests and quality assurance tests, and meets qualification criteria stipulated in contracts, regulations, or specifications (sometimes called "certification schemes" in the product certification industry).

  5. First article inspection - Wikipedia

    en.wikipedia.org/wiki/First_article_inspection

    A First Article Inspection (FAI) is a production validation process for verifying that a new or modified production process produces conforming parts that meet the manufacturing specification detailed in technical or engineering drawings. Typically, a supplier performs the FAI and the purchaser reviews the report.

  6. Commissioning (construction) - Wikipedia

    en.wikipedia.org/wiki/Commissioning_(construction)

    In construction, commissioning or commissioning process (often abbreviated Cx) [1] [2] [3] is an integrated, systematic process to ensure, that all building systems perform interactively according to the "Design Intent", through documented verification. The commissioning process establishes and documents the "Owner's Project Requirements (OPR ...

  7. 50 Divisions - Wikipedia

    en.wikipedia.org/wiki/50_Divisions

    Process Equipment Subgroup: Division 40 — Process Interconnections; Division 41 — Material Processing and Handling Equipment; Division 42 — Process Heating, Cooling, and Drying Equipment; Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment; Division 44 — Pollution Control Equipment

  8. Specification (technical standard) - Wikipedia

    en.wikipedia.org/wiki/Specification_(technical...

    The original listing of specification divisions was based on the time sequence of construction, working from exterior to interior, and this logic is still somewhat followed as new materials and systems make their way into the construction process. Each section is subdivided into three distinct parts: "general", "products" and "execution".

  9. Candidate submittal - Wikipedia

    en.wikipedia.org/wiki/Candidate_Submittal

    Candidate Submittal agencies aim to re-cast the role of a recruiter into more of a background setting. Using a candidate submittal service, the client will receive feedback and advice with regards to their application. They will not however be interviewed or matched to a position by the candidate submittal agency.