Search results
Results From The WOW.Com Content Network
Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form a suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is ...
3. Drilling an oil or gas well within a developed field for which an approved land use plan or any environmental document prepared pursuant to NEPA analyzed such drilling as a reasonably foreseeable activity, so long as such plan or document was approved within five (5) years prior to the date of spudding the well 4.
The caisson provides buoyancy during construction and towing and acts also as a foundation structure in the operation phase. Furthermore, the caisson could be used as storage volume for oil or other liquids. [1] Floating units may be held in position by anchored wires or chains in a spread mooring pattern.
Screw foundations first appeared in the 1800s as pile foundations for lighthouses, [4] and were extensively used for piers in harbours. Between the 1850s through 1890s, more than 100 screw-pile lighthouses were erected on the east coast of the United States using screw piles. Made originally from cast or wrought iron, they had limited bearing ...
States require a drilling permit before a well begins drilling. Requirements to receive drilling permits generally include minimum setbacks from lease or unit boundaries, and adequate casing and cementing programs. States generally require permits for or notices of major work done on a well, and periodic reports of oil and gas produced.
A DeLong pier is a type of elonged ersatz pier constructed from prefabricated barge-like sections and simple caissons driven into a harbor's seafloor. First used during the Vietnam War at Cam Ranh Bay , the DeLong pier was originally designed shortly after the Second World War by the DeLong Corporation, and a prototype was constructed not long ...
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.