When.com Web Search

  1. Ads

    related to: rubble trench foundations systems stock

Search results

  1. Results From The WOW.Com Content Network
  2. Rubble trench foundation - Wikipedia

    en.wikipedia.org/wiki/Rubble_trench_foundation

    A rubble trench foundation with a concrete grade beam is not recommended for earthquake prone areas. [3] A foundation must bear the structural loads imposed upon it and allow proper drainage of ground water to prevent expansion or weakening of soils and frost heaving. While the far more common concrete foundation requires separate measures to ...

  3. Foundation (engineering) - Wikipedia

    en.wikipedia.org/wiki/Foundation_(engineering)

    Rubble trench foundations are a shallow trench filled with rubble or stones. These foundations extend below the frost line and may have a drain pipe which helps groundwater drain away. They are suitable for soils with a capacity of more than 10 tonnes/m 2 (2,000 pounds per square foot).

  4. French drain - Wikipedia

    en.wikipedia.org/wiki/French_drain

    A diagram of a traditional French drain. A French drain [1] (also known by other names including trench drain, blind drain, [1] rubble drain, [1] and rock drain [1]) is a trench filled with gravel or rock, or both, with or without a perforated pipe that redirects surface water and groundwater away from an area.

  5. The following is a list of publicly traded companies having the greatest market capitalization, sometimes described as their "market value": [1]. Market capitalization is calculated by multiplying the share price on a selected day and the number of outstanding shares on that day.

  6. List of construction methods - Wikipedia

    en.wikipedia.org/wiki/List_of_Construction_methods

    Trench fill foundations are a variation of strip foundations. The trench excavation is almost completely filled with concrete. Rubble trench foundations are a further variation of trench fill foundations and are a traditional construction method that uses loose stone or rubble to minimise the use of concrete and improve drainage.

  7. Rubble - Wikipedia

    en.wikipedia.org/wiki/Rubble

    Rubble-work on Wyggeston's Chantry House in Leicester, built c. 1511 "Rubble-work" is a name applied to several types of masonry. [1] One kind, where the stones are loosely thrown together in a wall between boards and grouted with mortar almost like concrete, is called in Italian "muraglia di getto" and in French "bocage". [1]

  8. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    These piles are connected by a foundation pad upon which the column pier is erected. Caisson engineering has been used since at least the 19th century, with three prominent examples being the Royal Albert Bridge (completed in 1859), the Eads Bridge (completed in 1874), and the Brooklyn Bridge (completed in 1883).

  9. Slurry wall - Wikipedia

    en.wikipedia.org/wiki/Slurry_wall

    The trench is at all times kept filled with slurry to prevent its collapse, but the fluid filling allows the excavation machinery and excavation spoil to be moved without hindrance. Once a particular depth of trench is reached, a reinforcing cage is lowered into the slurry-filled pit and the pit is filled with concrete from the bottom up using ...