Ad
related to: load factor lease meaning in urdu version free printable blank
Search results
Results From The WOW.Com Content Network
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
The first of the cooling load factors used in this method is the CLTD, or the Cooling Load Temperature Difference. This factor is used to represent the temperature difference between indoor and outdoor air with the inclusion of the heating effects of solar radiation. [1] [5] The second factor is the CLF, or the cooling load factor.
Multiple empirical formulae exist that relate the loss factor to the load factor (Dickert et al. in 2009 listed nine [5]). Similarly, the ratio between the average and the peak current is called form coefficient k [ 6 ] or peak responsibility factor k , [ 7 ] its typical value is between 0.2 to 0.8 for distribution networks and 0.8 to 0.95 for ...
Load factor (electrical), the average power divided by the peak power over a period of time Capacity factor , the ratio of actual energy output to the theoretical maximum possible in a power station Passenger load factor , the ratio of revenue passenger miles to available seat miles of a particular transportation operation (e.g. a flight)
Full Load hour is a measure of the degree of utilisation of a technical system. [1] [2] [3] Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.
Loss of load in an electrical grid is a term used to describe the situation when the available generation capacity is less than the system load. [1] Multiple probabilistic reliability indices for the generation systems are using loss of load in their definitions, with the more popular [2] being Loss of Load Probability (LOLP) that characterizes a probability of a loss of load occurring within ...
It represents the amount of value that the owner of an asset can expect to obtain when the asset of its lease or when it reaches the end of its useful life. [1] [2] Example: A car is sold at a list price of $20,000 today. After a usage of 36 months and 50,000 miles (ca. 80,467 km) its value is contractually defined as $10,000 or 50%.
Loss factor may refer to: Loss factor , in real estate the percentage of the building's area shared by tenants or space that are dedicated to the common areas of a building used to calculate the difference between the net (usable) and gross (billable) areas.