Ads
related to: slab on grade foam forms
Search results
Results From The WOW.Com Content Network
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Foam concrete, also known as Lightweight Cellular Concrete (LCC) and Low Density Cellular Concrete (LDCC), and by other names, is defined as a cement-based slurry, with a minimum of 20% (per volume) foam entrained into the plastic mortar. [1]
The slab can be decoupled from ground temperatures by insulation, with the concrete poured directly over insulation (for example, extruded polystyrene foam panels), or heating provisions (such as hydronic heating) can be built into the slab. Slab-on-grade foundations should not be used in areas with expansive clay soil.
Insulation may be categorized by its composition (natural or synthetic materials), form (batts, blankets, loose-fill, spray foam, and panels), structural contribution (insulating concrete forms, structured panels, and straw bales), functional mode (conductive, radiative, convective), resistance to heat transfer, environmental impacts, and more.
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]