Ads
related to: self leveling concrete coverage calculator
Search results
Results From The WOW.Com Content Network
Flow table with a grip and a hinge, 70 centimetres (28 in) square. In the American version of this test, the table is 10 inches (25 cm) diameter per ASTM C 230.; Abrams cone, open at the top and at the bottom - 30 centimetres (12 in) high, 17 centimetres (6.7 in) top diameter, 25 centimetres (9.8 in) base diameter.
Self-leveling concrete was invented in 1952 by Axel Karlsson from Sweden. The first product was a combination of wood glue, fine sand and cement with additives. [1] It was called flytspackel, which directly translates to "floating putty". The term self-leveling can be traced back to a patent applied by the company Lafarge in 1997. [2]
In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
Self-consolidating concrete or self-compacting concrete (SCC) [1] is a concrete mix which has a low yield stress, high deformability, good segregation resistance (prevents separation of particles in the mix), and moderate viscosity (necessary to ensure uniform suspension of solid particles during transportation, placement (without external compaction), and thereafter until the concrete sets).
Concrete cover, in reinforced concrete, is the least distance between the surface of embedded reinforcement and the outer surface of the concrete (ACI 130). The concrete cover depth can be measured with a cover meter. The purpose of concrete cover is to protect the reinforcement from corrosion, fire, and other potential damage.
Concrete has a limited lifespan between batching / mixing and curing. This means that ready-mixed concrete should be placed within 30 to 45 minutes of the batching process to hold slump and mix design specifications in the US, [15] though in the UK, environmental and material factors, plus in-transit mixing, allow for up two hours to elapse. [16]