Ads
related to: 2 conductors in a well pump diagram
Search results
Results From The WOW.Com Content Network
Submersible pump cables are electrical conductors designed for use in wet ground or under water, with types specialized for pump environmental conditions. [5] [6] [7] A submersible pump cable is a specialized product to be used for a submersible pump in a deep well, or in similarly harsh conditions.
[2] Conductor Casing. In the offshore drilling industry, the conductor pipe is set in the seabed, and is a key structural foundation for the subsea wellhead. When drilling an offshore well, a marine riser is connected to the well, and this is subjected to large environmental forces such as current and waves which are transferred to the ...
Shale shaker (#2) separates drill cuttings from the drilling fluid before it is pumped back down the wellbore. Stand (#16) is a section of 2 or 3 joints of drill pipe connected and stood upright in the derrick. When they are pulled out of the hole, instead of laying down each joint of drill pipe, 2 or 3 joints are left connected and stood in ...
A diagram of a pumpjack. A pumpjack is the overground drive for a reciprocating piston pump in an oil well. [1] It is used to mechanically lift liquid out of the well if there is not enough bottom hole pressure for the liquid to flow all the way to the surface. The arrangement is often used for onshore wells. Pumpjacks are common in oil-rich areas.
Wireline truck rigged up to a drilling rig in Canada. In the oil and gas industry, the term wireline usually refers to the use of multi-conductor, single conductor or slickline cable, or "wireline", as a conveyance for the acquisition of subsurface petrophysical and geophysical data and the delivery of well construction services such as pipe recovery, perforating, plug setting and well ...
When the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a Christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.
A typical one-line diagram with annotated power flows. Red boxes represent circuit breakers, grey lines represent three-phase bus and interconnecting conductors, the orange circle represents an electric generator, the green spiral is an inductor, and the three overlapping blue circles represent a double-wound transformer with a tertiary winding.
Pumping flow: the tubing and pump are run to a depth beneath the working fluid. The pump and rod string are installed concentrically within the tubing. A tubing anchor prevents tubing movement while pumping. Tubing flow: a tubing string and a production packer are installed. The packer means that all the flow goes through the tubing.