Cycle time variation is a metric and philosophy for continuous improvement with the aim of driving down the deviations in the time it takes to produce successive units on a production line. [1] It supports organizations' application of lean manufacturing or lean production by eliminating wasteful expenditure of resources.
Overall equipment effectiveness [1] (OEE) is a measure of how well a manufacturing operation is utilized (facilities, time and material) compared to its full potential, during the periods when it is scheduled to run. It identifies the percentage of manufacturing time that is truly productive.
Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.
In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method. [1] It includes appropriate allowances to allow the person to recover from fatigue and, where necessary, an additional allowance to cover contingent elements which may ...
A static system does not change in behavior and hence the system stays constant. Finding a bottleneck in a static system is very simple, it is simply the machine or process with the longest constant cycle time. Static systems do not exist in reality as no matter what, there will always be a slight fluctuation in cycle time.
Methods-Time Measurement (MTM) is a predetermined motion time system that is used primarily in industrial settings to analyze the methods used to perform any manual operation or task and, as a product of that analysis, to set the standard time in which a worker should complete that task.
Work measurement is the application of techniques which is designed to establish the time for an average worker to carry out a specified manufacturing task at a defined level of performance. [1] It is concerned with the duration of time it takes to complete a work task assigned to a specific job.
The total first time yield is equal to FTYofA * FTYofB * FTYofC * FTYofD or 0.9000 * 0.8889 * 0.9375 * 0.9333 = 0.7000. You can also get the total process yield for the entire process by simply dividing the number of good units produced by the number going into the start of the process. In this case, 70/100 = 0.70 or 70% yield.