The Gotthard Tunnel (German: Gotthardtunnel, Italian: Galleria del San Gottardo) is a 15-kilometre-long (9.3 mi) railway tunnel that forms the summit of the Gotthard Railway in Switzerland. It connects Göschenen with Airolo and was the first tunnel through the Saint-Gotthard Massif in order to bypass the St Gotthard Pass .
As of 2016, the Gotthard Base Tunnel is the longest railway tunnel in the world. It is the third Swiss tunnel to bear this title, after the Gotthard Tunnel (15 km or 9.3 mi, 1882) and the Simplon Tunnel (19.8 km or 12.3 mi, 1905). [28] It is the third tunnel built under the Gotthard, after the Gotthard Tunnel and the Gotthard Road Tunnel.
The Gotthard Road Tunnel is one of the three tunnels that connect the Swiss Plateau to southern Switzerland and run under the Gotthard Massif, the two other being railway tunnels, the Gotthard Tunnel (1882) and the Gotthard Base Tunnel (2016). All three tunnels bypass the Gotthard Pass, an important trade route since the 13th century.
The first one, the 15 kilometres (9.3 mi) Gotthard Rail Tunnel, opened in 1882 for railway traffic at a cost of around 200 workers' lives (there is uncertainty as to the exact toll). [6] The second one, the 17 kilometres (11 mi) Gotthard Road Tunnel (a motorway tunnel), opened in 1980. It was closed for two months in 2001 following a fatal fire.
The first stage of the Rail 2000 project finished in 2005, included a new high-speed rail track between Bern and Olten with an operating speed of 200 km/h (125 mph).. The second stage of Rail 2000, still in project, includes line upgrades in the Valais canton (200 km/h (125 mph)) and between Biel and Solothurn (also 200 km/h (125 mph)).
The Ceneri Base Tunnel was opened on 3 September 2020 and became fully operational in December 2020 and is an important feeder for the Gotthard Base Tunnel. [4] A decision to fully complete the second tube of the Lötschberg Base Tunnel was made in early-2024, with an estimated cost of CHF 1.7 billion [ 5 ] and construction expected to extend ...
In spite of this, the cost of the tunnel per running foot was a third less than that of the great Mont Cenis Tunnel. A contemporary account of his death was written by the general secretary of the company, Maxime Helene, based on the account of M. Stockalper, the engineer in chief of the Göschenen section of the tunnel, who accompanied Favre ...
During the construction of the Gotthard tunnel the population of Göschenen rose a few times. The construction workers lived in precarious conditions. [1]On the 27th of July the Italian tunnel workers began a strike, demanding better wages and created an uproar in the village.