When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form a suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is ...

  3. Piling - Wikipedia

    en.wikipedia.org/wiki/Piling

    Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...

  4. Will Texas run out of groundwater? Experts explain how ... - AOL

    www.aol.com/news/texas-run-groundwater-experts...

    Water levels in wells across Texas are running low because of the extreme drought, groundwater experts say. ... it could be a situation a lot of it is maybe the well was drilled 20, 30, 40 years ...

  5. Dolphin (structure) - Wikipedia

    en.wikipedia.org/wiki/Dolphin_(structure)

    Wood pilings grouped into a pair of dolphins serving as a protected entryway to a boat basin. A dolphin is a group of pilings arrayed together to serve variously as a protective hardpoint along a dock, in a waterway, or along a shore; as a means or point of stabilization of a dock, bridge, or similar structure; as a mooring point; and as a base for navigational aids.

  6. Is Texas is running out of water? Texas Agriculture ... - AOL

    www.aol.com/texas-running-water-texas...

    Texas' water infrastructure, such as dams, pipelines, and reservoirs, is aging and often not equipped to handle modern water management challenges. Leakage and inefficiencies exacerbate the problem.

  7. Offshore concrete structure - Wikipedia

    en.wikipedia.org/wiki/Offshore_concrete_structure

    The original Condeep always rests on the sea floor, and the shafts rise to about 30m above the sea level. The platform deck itself is not a part of the construction. The Condeep Platforms Brent B (1975) and Brent D (1976) were designed for a water depth of 142m in the Brent oilfield operated by Shell. Their main mass is represented by the ...

  8. Parts of Texas ‘out of water’ as the rest dries out, ag ...

    www.aol.com/parts-texas-water-rest-dries...

    Some regions of Texas have already run out of water — and the rest face a looming crisis, the state’s agriculture commissioner said on Sunday. “We lose about a farm a week in Texas, but it ...

  9. Breakwater (structure) - Wikipedia

    en.wikipedia.org/wiki/Breakwater_(structure)

    A breakwater structure is designed to absorb the energy of the waves that hit it, either by using mass (e.g. with caissons), or by using a revetment slope (e.g. with rock or concrete armour units). In coastal engineering, a revetment is a land-backed structure whilst a breakwater is a sea-backed structure (i.e. water on both sides).