When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Clearance (civil engineering) - Wikipedia

    en.wikipedia.org/wiki/Clearance_(civil_engineering)

    In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.

  3. CRAFT (aviation) - Wikipedia

    en.wikipedia.org/wiki/CRAFT_(aviation)

    The flight should climb to and maintain 5000 feet initially, and further clearance to FL330 may be expected (but is not guaranteed) ten minutes after departure. The frequency to which the crew should tune after departure is 124.50 MHz, and the transponder should be set to 6562 before departure.

  4. Structure gauge - Wikipedia

    en.wikipedia.org/wiki/Structure_gauge

    The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in). [2] In UK, the "standard minimum clearance" for structures over public highways is 16 feet 6 inches (5.03 m). [3]

  5. Check sheet - Wikipedia

    en.wikipedia.org/wiki/Check_sheet

    Example checklist. While the check sheets discussed above are all for capturing and categorizing observations, the checklist is intended as a mistake-proofing aid when carrying out multi-step procedures, particularly during the checking and finishing of process outputs. This type of check sheet consists of the following:

  6. Loading gauge - Wikipedia

    en.wikipedia.org/wiki/Loading_gauge

    The clearance space between a train and the tunnel is often small. Pictured is a London Underground Northern line 1995 Stock train emerging from the tunnel north of Hendon Central station. A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads.

  7. Air draft - Wikipedia

    en.wikipedia.org/wiki/Air_draft

    The vessel's clearance is the distance in excess of the air draft which allows a vessel to pass safely under a bridge or obstacle such as power lines, etc.A bridge's "clearance below" is most often noted on charts as measured from the surface of the water to the underside of the bridge at the chart datum Mean High Water (MHW), [3] [4] a less restrictive clearance than Mean Higher High Water ...

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Minimum railway curve radius - Wikipedia

    en.wikipedia.org/wiki/Minimum_railway_curve_radius

    For a line with a maximum speed of 60 km/h (37 mph), buffer-and-chain couplers increase the minimum radius to around 150 m (164 yd; 492 ft). As narrow-gauge railways , tramways , and rapid transit systems normally do not interchange with mainline railways, instances of these types of railway in Europe often use bufferless central couplers and ...