When.com Web Search

  1. Ad

    related to: retention ponds design

Search results

  1. Results From The WOW.Com Content Network
  2. Retention basin - Wikipedia

    en.wikipedia.org/wiki/Retention_basin

    A retention basin, sometimes called a retention pond, wet detention basin, or storm water management pond (SWMP), is an artificial pond with vegetation around the perimeter and a permanent pool of water in its design.

  3. Detention basin - Wikipedia

    en.wikipedia.org/wiki/Detention_basin

    This basin type differs from a retention basin, also known as a "wet pond," which includes a permanent pool of water. [ 7 ] [ 8 ] [ 9 ] While basic detention ponds are typically designed to empty within 6 to 12 hours after a storm, extended detention (ED) dry basins improve the basic detention design by lengthening the storage time, for example ...

  4. Aerated lagoon - Wikipedia

    en.wikipedia.org/wiki/Aerated_lagoon

    The ponds or basins may range in depth from 1.5 to 5.0 meters. [ 6 ] In a surface-aerated system, the aerators provide two functions: they transfer air into the basins required by the biological oxidation reactions, and they provide the mixing required for dispersing the air and for contacting the reactants (that is, oxygen, wastewater and ...

  5. Waste stabilization pond - Wikipedia

    en.wikipedia.org/wiki/Waste_stabilization_pond

    Their design criteria have changed very little over the years. [15] Ponds are simple to design, build, operate and maintain, which is very important in remote areas and in developing countries where sophisticated equipment and highly skilled labor is not easily available. Construction may be done by local contractors in small towns.

  6. Bioswale - Wikipedia

    en.wikipedia.org/wiki/Bioswale

    Starting in 1997 the project design team worked with the California Department of Fish and Game and County of Sonoma to produce a detailed design to channel surface runoff at the perimeter of a large parking area. Surface runoff consists of building roof runoff, parking lot runoff and overland flow from properties to the north of the project ...

  7. National homebuilder to build 700 homes in New Smyrna ... - AOL

    www.aol.com/national-homebuilder-build-700-homes...

    Plans include new storm water retention ponds to reduce the potential for flooding. "We'll actually have a 55% after-development drop (in flooding potential)," he said.

  8. Infiltration basin - Wikipedia

    en.wikipedia.org/wiki/Infiltration_basin

    Recently completed infiltration basin for stormwater collection. An infiltration basin (or recharge basin) is a form of engineered sump [1] or percolation pond [2] that is used to manage stormwater runoff, prevent flooding and downstream erosion, and improve water quality in an adjacent river, stream, lake or bay.

  9. ‘What in the world?’: Colorado homes to be bulldozed after ...

    www.aol.com/finance/world-colorado-homes...

    The problem began in 2023 when a flood revealed that the land beneath four homes in the neighborhood — including Sturgon's — was originally a retention pond designed to protect the community ...