When.com Web Search

  1. Ads

    related to: drilling casing depth guide size

Search results

  1. Results From The WOW.Com Content Network
  2. Casing (borehole) - Wikipedia

    en.wikipedia.org/wiki/Casing_(borehole)

    The purpose of surface casing is to isolate freshwater zones so that they are not contaminated during drilling and completion. Surface casing is the most strictly regulated due to these environmental concerns, which can include regulation of casing depth and cement quality. A typical size of surface casing is 13 + 3 ⁄ 8 inches (340 mm). [5]

  3. Conductor pipe - Wikipedia

    en.wikipedia.org/wiki/Conductor_pipe

    Conductor pipe. A conductor Pipe is a large diameter pipe that is set into the ground to provide the initial stable structural foundation for a borehole or oil well. [1] The Conductor pipe is the first string of casing and is the largest diameter casing to be installed in a well. It can also be referred to as a drive pipe because it is often ...

  4. Casing string - Wikipedia

    en.wikipedia.org/wiki/Casing_string

    Casing is run to protect or isolate formations adjacent to the wellbore. It is generally not possible to drill a well through all of the formations from surface (or the seabed) to the target depth in one hole-size section. For example, fresh-water-bearing zones (usually found only near the surface) must be protected soon after being penetrated.

  5. Completion (oil and gas wells) - Wikipedia

    en.wikipedia.org/wiki/Completion_(oil_and_gas_wells)

    Completion (oil and gas wells) Well completion is the process of making a well ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as ...

  6. Driller's depth - Wikipedia

    en.wikipedia.org/wiki/Driller's_depth

    Driller's depth is always recorded, and it constitutes the primary depth system, unless it is later superseded by a more accurate measurement such as the depth from an open- or cased-hole wireline log. Driller's depth should always have 1) a unit of measurement e.g. meter or feet, 2) a datum reference e.g. rig floor.

  7. List of components of oil drilling rigs - Wikipedia

    en.wikipedia.org/wiki/List_of_components_of_oil...

    Drill bit (#26) is a device attached to the end of the drill string that breaks apart the rock being drilled. It contains jets through which the drilling fluid exits. Drill floor (#21) is the area on the rig where the tools are located to make the connections of the drill pipe, bottom hole assembly, tools and bit. It is considered the main area ...

  8. Production tubing - Wikipedia

    en.wikipedia.org/wiki/Production_tubing

    Production casing is the final casing string set in a well and usually reaches from the surface to Target Depth (TD). The type of casing used depends upon the different conditions in the well. Commonly, production casing sizes range from 4 + 1 ⁄ 2 in (110 mm) to as large as 9 + 5 ⁄ 8 in (240 mm). It is the last string cemented in a well ...

  9. Exploration diamond drilling - Wikipedia

    en.wikipedia.org/wiki/Exploration_diamond_drilling

    There are five major "wire line" tube sizes typically used. Larger tubes produce larger diameter rock cores and require more drill power to drive them. The choice of tube size is a trade-off between the rock core diameter desired and the depth that can be drilled with a particular drilling rig motor. Standard "Q" wire line bit sizes: [10] Drill ...