Ad
related to: casing hole design for manufacturing company pdf
Search results
Results From The WOW.Com Content Network
Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream. The lower portion (and sometimes the entirety) is typically held in place with cement. [1]
A wellhead is the component at the surface of an oil or gas well that provides the structural and pressure-containing interface for the drilling and production equipment. Wellhead gas storage, Etzel Germany. Oil well Christmas tree. The primary purpose of a wellhead is to provide the suspension point and pressure seals for the casing strings ...
Drilling engineers are in charge of the process of planning and drilling the wells. Their responsibilities include: Designing well programs (e.g., casing sizes and setting depths) to prevent blowouts (uncontrolled well-fluid release) while allowing adequate formation evaluation. Designing or contributing to the design of casing strings and ...
AGT – (1) agitator, used in drilling. AGT – (2) authorised gas tester (certified by OPITTO) AGT – (3) Azerbaijan – Georgia – Turkey (a region rich in oil related activity) [3] AHBDF – along hole (depth) below Derrick floor. AHD – along hole depth. AHU – air handling unit. AICD – autonomous inflow control device.
Drill pipe. Drill pipe, is hollow, thin-walled, steel or aluminium alloy piping that is used on drilling rigs. It is hollow to allow drilling fluid to be pumped down the hole through the bit and back up the annulus. It comes in a variety of sizes, strengths, and wall thicknesses, but is typically 27 to 32 feet in length (Range 2).
Steel casing pipe is often specified as ASTM A-252 which is a structural grade material that does not require hydrostatic testing and the inspection requirements are not stringent and it usually costs less than other grades such as A-53, [2] A-139 or API 5L. Used natural gas line pipe is also used as casing on many projects because it is often ...
EO, ECO, ECN. engineering order. An order from the engineering department (to be followed by the production department or vendor) overriding/superseding a detail on the drawing, which gets superseded with revised information. Also called by various other names, such as engineering change order (ECO), engineering change notice (ECN), drawing ...
A production packer[1] is a standard component of the completion hardware of oil or gas wells used to provide a seal between the outside of the production tubing and the inside of the casing, liner, or wellbore wall. Based on their primary use, packers can be divided into two main categories: production packers and service packers.