Ads
related to: verona to rome train time
Search results
Results From The WOW.Com Content Network
High-speed service was introduced on the Rome-Milan line in 1988–89 with the ETR 450 Pendolino train, with a top speed of 250 km/h (160 mph) and cutting travel times from about 5 hours to 4. [7] The prototype train ETR X 500 was the first Italian train to reach 300 km/h (190 mph) on the Direttissima on 25 May 1989. [7]
Frecciargento (Italian: [ˌfrettʃarˈdʒɛnto]; from freccia argento, "silver arrow") is a high-speed train of the Italian national train operator, Trenitalia, as one of its Le Frecce brands (along with Frecciarossa and Frecciabianca). The name was introduced in 2012; these trains were previously branded as Eurostar Italia.
The Verona–Bologna railway is a major Italian railway connecting Verona and Bologna and part of the major axis from the Brenner railway to the Bologna–Florence and on to Rome. The line is part of the Line 1 of Trans-European Transport Networks (TEN-T). It is considered a "fundamental" line by the state railways Ferrovie dello Stato (FS). [4]
High-speed passenger trains take 37 minutes over the route compared to about 59 minutes previously. [2] The line's northern end is at Bologna Centrale railway station and it connects with the Milan–Bologna high-speed line and lines to Venice (Padua–Bologna railway) and Verona (Verona–Bologna railway), respectively.
Rome: Rome Termini station - Fiumicino Airport (31 minutes) Verona: Verona Porta Nuova station - Villafranca "Catullo" Airport (20 minutes) Bologna: Centrale station - Bologna Airport (20 minutes) - Route modified in November 2020. It shifted from route BLQ (Bologna Centrale Station-Bologna Airport) to route 944 Ospedale Maggiore-Bologna Airport
The first line connects Turin to Salerno via Milan, Bologna, Florence, Rome and Naples, the second runs from Turin to Venice via Milan and Verona, and is under construction in parts. [24] Trains are operated with a top speed of 300 km/h (190 mph).
Ad
related to: verona to rome train time