The wall below the DPC may become saturated in rainy weather. The DPC in the inner wall is usually below floor level, (under a suspended timber floor structure), or, with a solid concrete floor, it is usually found immediately above the floor slab so that it can be linked to the DPM under the floor slab.
Trap with copper drain pipe at underside of firestop packing in two-hour fire-resistance rated concrete floor slab Typical P-trap. Maintaining the water seal is critical to trap operation; traps might dry out, and poor venting can suction or blow water out of the traps. This is usually avoided by venting the drain pipes downstream of the trap ...
Riser Clamp holding plastic pipe, penetrating through a concrete floor slab. The copper pipe penetration is firestopped with firestop mortar. Riser clamp for a standpipe through-penetration firestop inside a fire hose cabinet under construction
Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.
For example, a 4" pipe, with 1" of thermal insulation makes a 6" penetrant (1" pipe covering on each side of the pipe), plus two pipe sizes = an 8" sleeve, creating a 1" annulus. In case of insulated piping, the size of the insulation must be taken into account for the intended firestop certification listing .
Above the targeted bottom height (coplanar with the compacted sand and gravel topping) a separate grid of rebar or welded wire mesh is usually added to reinforce the concrete, and will be tied to the under slab "girder" rebar at intervals. The under slab cast girders are used especially if it the slab be used structurally, i.e., to support part ...
This consists of a timber member jammed on a pad piece on either the deck or deck head depending on water levels in the compartment and a strong point, this is called the proud. Then there is a horizontal timber cut to size to fit between this and what it is shoring up, e.g. a splinter box, bulkhead or door.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...