When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Linear scheduling method - Wikipedia

    en.wikipedia.org/wiki/Linear_scheduling_method

    Line-of-balance; Flowline or flow line; Repetitive scheduling method; Vertical production method; Time-location matrix model; Time space scheduling method; Disturbance scheduling; Horizontal and vertical logic scheduling for multistory projects; Horizontal and vertical scheduling; Multiple repetitive construction process; Representing ...

  3. Production leveling - Wikipedia

    en.wikipedia.org/wiki/Production_leveling

    Uneven production process in simulation inside production simulation game in Ford's Museum. Production leveling, also known as production smoothing or – by its Japanese original term – heijunka (平準化), [1] is a technique for reducing the mura (unevenness) which in turn reduces muda (waste).

  4. Burndown chart - Wikipedia

    en.wikipedia.org/wiki/Burndown_chart

    Ideal work remaining line This is a straight line that connects the start point to the end point. At the start point, the ideal line shows the sum of the estimates for all the tasks (work) that needs to be completed. At the end point, the ideal line intercepts the x-axis showing that there is no work left to be completed.

  5. Testing, adjusting, balancing - Wikipedia

    en.wikipedia.org/wiki/Testing,_adjusting,_balancing

    Balancing is the methodical regulation of system fluid flows (air or water) through the use of acceptable procedures to achieve the desired or specified design airflow or water flow. When beginning the balance of a system, you must locate the terminal with the least amount of flow in regards to the engineer's drawing.

  6. Drainage equation - Wikipedia

    en.wikipedia.org/wiki/Drainage_equation

    A drainage equation is an equation describing the relation between depth and spacing of parallel subsurface drains, depth of the watertable, depth and hydraulic conductivity of the soils. It is used in drainage design. Parameters in Hooghoudt's drainage equation. A well known steady-state drainage

  7. Causal loop diagram - Wikipedia

    en.wikipedia.org/wiki/Causal_loop_diagram

    To determine if a causal loop is reinforcing or balancing, one can start with an assumption, e.g. "Variable 1 increases" and follow the loop around. The loop is: reinforcing if, after going around the loop, one ends up with the same result as the initial assumption. balancing if the result contradicts the initial assumption.

  8. Techno-economic assessment - Wikipedia

    en.wikipedia.org/wiki/Techno-economic_assessment

    Techno-economic assessment or techno-economic analysis (abbreviated TEA) is a method of analyzing the economic performance of an industrial process, product, or service. . The methodology originates from earlier work on combining technical, economic and risk assessments for chemical production processes

  9. Runoff model (reservoir) - Wikipedia

    en.wikipedia.org/wiki/Runoff_model_(reservoir)

    The recharge during a unit time step (T2−T1=1) can be found from R = Rain − Sd The actual storage at the end of a unit time step is found as Sa2 = Sa1 + Rain − R − Ea, where Sa1 is the actual storage at the start of the time step. The Curve Number method (CN method) gives another way to calculate the recharge.

  1. Related searches line balancing efficiency formula calculator with steps pdf file template

    calculate balancingbalancing in engineering