When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Standard time (manufacturing) - Wikipedia

    en.wikipedia.org/wiki/Standard_time_(manufacturing)

    The Standard Time is the product of three factors: Observed time: The time measured to complete the task. Performance rating factor: The number pace the person is working at. 90% is working slower than normal, 110% is working faster than normal, 100% is normal.

  3. Balancing of rotating masses - Wikipedia

    en.wikipedia.org/wiki/Balancing_of_rotating_masses

    These four readings are sufficient to define the size and position of a final mass to achieve good balance. Ref 4 For production balancing, the phase of dynamic vibration is observed with its amplitude. This allows one-shot dynamic balance to be achieved with a single spin, by adding a mass of internally calculated size in a calculated position.

  4. Production leveling - Wikipedia

    en.wikipedia.org/wiki/Production_leveling

    Uneven production process in simulation inside production simulation game in Ford's Museum. Production leveling, also known as production smoothing or – by its Japanese original term – heijunka (平準化), [1] is a technique for reducing the mura (unevenness) which in turn reduces muda (waste).

  5. File:Balancing and rebalancing.pdf - Wikipedia

    en.wikipedia.org/wiki/File:Balancing_and...

    Main page; Contents; Current events; Random article; About Wikipedia; Contact us

  6. Linear scheduling method - Wikipedia

    en.wikipedia.org/wiki/Linear_scheduling_method

    Specific names for the linear scheduling method have been adopted, such as: [1] Location-based scheduling (the preferred term in the book) Harmonograms

  7. Testing, adjusting, balancing - Wikipedia

    en.wikipedia.org/wiki/Testing,_adjusting,_balancing

    In heating, ventilation, and air conditioning (HVAC), testing, adjusting and balancing (TAB) are the three major steps used to achieve proper operation of heating, ventilation, and air conditioning systems. TAB usually refers to commercial building construction and the specialized contractors who employ personnel that perform this service.

  8. Goodman relation - Wikipedia

    en.wikipedia.org/wiki/Goodman_relation

    Within the branch of materials science known as material failure theory, the Goodman relation (also called a Goodman diagram, a Goodman-Haigh diagram, a Haigh diagram or a Haigh-Soderberg diagram) is an equation used to quantify the interaction of mean and alternating stresses on the fatigue life of a material. [1]

  9. Smith chart - Wikipedia

    en.wikipedia.org/wiki/Smith_chart

    The Smith chart (sometimes also called Smith diagram, Mizuhashi chart (水橋チャート), Mizuhashi–Smith chart (水橋スミスチャート), [1] [2] [3] Volpert–Smith chart (Диаграмма Вольперта—Смита) [4] [5] or Mizuhashi–Volpert–Smith chart) is a graphical calculator or nomogram designed for electrical and electronics engineers specializing in radio ...