When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Falsework - Wikipedia

    en.wikipedia.org/wiki/Falsework

    Completed falsework: Decking and some formwork has been added. The illustrations are of modern pipe-column falsework, used to support the formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge. When the supports are complete, wood beams and plywood or reusable ...

  3. Failure reporting, analysis, and corrective action system

    en.wikipedia.org/wiki/Failure_reporting...

    Failure Reporting (FR). The failures and the faults related to a system, a piece of equipment, a piece of software or a process are formally reported through a standard form (Defect Report, Failure Report). Analysis (A). Perform analysis in order to identify the root cause of failure. Corrective Actions (CA).

  4. RMD Kwikform - Wikipedia

    en.wikipedia.org/wiki/RMD_Kwikform

    It expanded rapidly in formwork and scaffolding under GKN ownership in the end of the 1980s. [2] In June 2000, GKN Kwikform merged with RMD (Rapid Metal Developments, established in 1948), the formwork and scaffolding unit of RM Douglas (part of Tilbury Douglas), to form RMD Kwikform. [3] [1] Tilbury Douglas renamed itself Interserve in 2001. [4]

  5. Loddon Bridge disaster - Wikipedia

    en.wikipedia.org/wiki/Loddon_Bridge_disaster

    The deck was formed from in-situ concrete laid onto timber plank formwork which was supported by a system of falsework. This consisted of a series of 26 lattice trusses beneath the deck. These measured 98 feet 4 inches (29.97 m) in length (extending into an adjacent span) and were made of four lattice sections connected together by scaffolding .

  6. Bathtub curve - Wikipedia

    en.wikipedia.org/wiki/Bathtub_curve

    The 'bathtub curve' hazard function (blue, upper solid line) is a combination of a decreasing hazard of early failure (red dotted line) and an increasing hazard of wear-out failure (yellow dotted line), plus some constant hazard of random failure (green, lower solid line). The bathtub curve is a particular shape of a failure rate graph.

  7. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    The formwork stays in place after the concrete has cured and acts as axial and shear reinforcement, as well as serving to confine the concrete and prevent against environmental effects, such as corrosion and freeze-thaw cycles. Flexible formwork. In contrast to the rigid moulds described above, flexible formwork is a system that uses ...

  8. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    This polystyrene insulated concrete form is cut away to show the inner structure of the formwork and the reinforcing bar (rebar). The cavity is filled with concrete to create the permanent wall. Insulating concrete forms or insulated concrete forms (ICF) are a building system to create reinforced concrete walls or floors with integral insulation.

  9. Controlled permeability formwork - Wikipedia

    en.wikipedia.org/wiki/Controlled_Permeability...

    Controlled Permeability Formwork, paper No.8, formwork practice in Japan. Report on an overseas Science and Technology Expert Mission, London, October 1989, pp. 29–32. Duggan, T. Enhancing concrete durability using Controlled Permeability Formwork. 17th Conference on Our World in Concrete and Structures, Singapore, August, 1992. pp. 57–62.