Search results
Results From The WOW.Com Content Network
Drawing number (same for every sheet of this document, unique for each technical document of the organization) Sheet number and number of sheets (for example, "Sheet 5/7") Date of issue (when the drawing was made) Traditional locations for the title block are the bottom right (most commonly) or the top right or center.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Was one of the big three spreadsheets (the others being Lotus 123 and Excel). EasyOffice EasySpreadsheet – for MS Windows. No longer freeware, this suite aims to be more user friendly than competitors. Framework – for MS Windows. Historical office suite still available and supported. It includes a spreadsheet.
Flared connections offer a high degree of long-term reliability and for this reason are often used in mission-critical and inaccessible locations. The tool used to flare tubing consists of a die that grips the tube, and either a mandrel or rolling cone is forced into the end of the tube to form the flare by cold working.
A "active end anchorage of a prestressing tendon that has jacking operations undertaken at that end. [3]: 20 load balancing A prestressed concrete design method in which the prestressing forces exerted upon the member act to balance a given proportion of the service loads that the member will be subjected to. [1]: 38 longitudinal prestressing
Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head
Double tees are connected during the construction without topping with concrete to create the parking structure floor surface. [6] A benefit of pre-topped double tees is a higher quality concrete for more durable surface to reduce traffic wears. Factories can produce the topping with minimum concrete strength of 5,000 psi. In some areas, the ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...