Search results
Results From The WOW.Com Content Network
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Google Sheets – as part of Google Workspace; iRows – closed since 31 December 2006; JotSpot Tracker – acquired by Google Inc. Smartsheet – Online spreadsheet for project management, interactive Gantt, file sharing, integrated with Google Apps [8] Sourcetable [9] – AI spreadsheet that generates formulas, charts, SQL, and analyzes data.
Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
A cell on a different sheet of the same spreadsheet is usually addressed as: =SHEET2!A1 (that is; the first cell in sheet 2 of the same spreadsheet). Some spreadsheet implementations in Excel allow cell references to another spreadsheet (not the currently open and active file) on the same computer or a local network.
A chart created with data from a Microsoft Excel spreadsheet that only saves the chart. To save the chart and spreadsheet save as .XLS. XLC is not supported in Excel 2007 or in any newer versions of Excel. Dialog .xld: Used in older versions of Excel. Archive .xlk: A backup of an Excel Spreadsheet Add-in (DLL) .xll
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Flared connections offer a high degree of long-term reliability and for this reason are often used in mission-critical and inaccessible locations. The tool used to flare tubing consists of a die that grips the tube, and either a mandrel or rolling cone is forced into the end of the tube to form the flare by cold working.