When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Prospective short-circuit current - Wikipedia

    en.wikipedia.org/wiki/Prospective_short-circuit...

    Where an industrial system is fed from an electrical utility, the short circuit level at the point of connection may be specified, often with minimum and maximum values or values to be expected after system growth. This allows calculation by an industrial customer of its internal fault levels within its plant.

  3. Hager Group - Wikipedia

    en.wikipedia.org/wiki/Hager_Group

    Hager distribution board Hager miniature circuit breakers. In 1955, Hager oHG, elektrotechnische Fabrik was founded by brothers Oswald and Hermann Hager, together with their father Peter Hager in Ensheim in the Saarland region of Germany. [7] [8] Since 1945, Saarland had been under the economic control of France and had no access to the German ...

  4. Breaking capacity - Wikipedia

    en.wikipedia.org/wiki/Breaking_capacity

    Calculation of the required breaking capacity involves determining the supply impedance and voltage. Supply impedance is calculated from the impedance of the elements making up the supply system. Customers of an electrical supply utility can request the maximum value of prospective short-circuit current available at their point of supply.

  5. Circuit breaker - Wikipedia

    en.wikipedia.org/wiki/Circuit_breaker

    The commonly available preferred values for rated current are 1 A, 2 A, 4 A, 6 A, 10 A, 13 A, 16 A, 20 A, 25 A, 32 A, 40 A, 50 A, 63 A, 80 A, 100 A, [6] and 125 A. The circuit breaker is labeled with the rated current in amperes prefixed by a letter, which indicates the instantaneous tripping current that causes the circuit breaker to trip ...

  6. Dielectric withstand test - Wikipedia

    en.wikipedia.org/wiki/Dielectric_withstand_test

    The maximum voltage is given in the test standard for the particular product. The application rate may also be adjusted to manage leakage currents resulting from inherent capacitive effects of the test object. The duration of the test is dependent on the test requirements of the asset owner but is normally up to 5 minutes.

  7. Contact resistance - Wikipedia

    en.wikipedia.org/wiki/Contact_resistance

    Contact resistance values are typically small (in the microohm to milliohm range). Contact resistance can cause significant voltage drops and heating in circuits with high current. Because contact resistance adds to the intrinsic resistance of the conductors, it can cause significant measurement errors when exact resistance values are needed.

  8. Maximum experimental safe gap - Wikipedia

    en.wikipedia.org/wiki/Maximum_Experimental_Safe_Gap

    Maximum experimental safe gap (MESG) is a standardized measurement of how easily a gas flame will pass through a narrow gap bordered by heat-absorbing metal. MESG is used to classify flammable gases for the design and/or selection of electrical equipment in hazardous areas , and flame arrestor devices. [ 1 ]

  9. Characteristic impedance - Wikipedia

    en.wikipedia.org/wiki/Characteristic_impedance

    The input impedance of an infinite line is equal to the characteristic impedance since the transmitted wave is never reflected back from the end. Equivalently: The characteristic impedance of a line is that impedance which, when terminating an arbitrary length of line at its output, produces an input impedance of equal value. This is so because ...