The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.
Hollow-core slabs, also known as voided slabs, initially appeared as one-way elements in Europe during the 1950s, and are still commonly manufactured in precast form for applications where fast construction and low self-weight are required. [2] [6] Waffle slabs are
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
However, this study concerned hollow concrete blocks and its results are unverified for concrete slabs. The actual value of k varies significantly in practice, and is usually between 0.8 and 2.0 W m −1 K −1. [8] This is relatively high when compared to other materials, for example the conductivity of wood may be as low as 0.04 W m −1 K −1.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
Concrete has a very low coefficient of thermal expansion, and as it matures concrete shrinks. All concrete structures will crack to some extent, due to shrinkage and tension. Concrete which is subjected to long-duration forces is prone to creep. The density of concrete varies, but is around 2,400 kilograms per cubic metre (150 lb/cu ft). [1]
For a small to medium project, the cost and time of hiring mixing equipment, labour, plus purchase and storage for the ingredients of concrete, added to environmental concerns (cement dust is an airborne health hazard) [10] may simply be not worthwhile when compared to the cost of ready-mixed concrete, where the customer pays for what they use ...
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.