In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
To minimize them a slowly-setting cement (CEM III, with blast furnace slags) is preferred to a quickly setting cement (CEM I: Portland cement). Pouring concrete under colder conditions (e.g., during the night, or in the winter), or using cold water and ice mixed with cooled aggregates to prepare concrete, may also contribute to minimize thermal ...
In 2013, 70.8 percent of portland cement was sold as ready-mix concrete, such as is delivered in cement-mixer trucks. 11.5 percent was sold dry to contractors and construction materials stores; 11.3 percent was sold to manufacturers of concrete products; 4.6 percent was sold for oil and gas wells, and 1.8 percent was sold to government agencies ...
The beam and base method of underpinning is a more technically advanced adaptation of traditional mass concrete underpinning. A reinforced concrete beam is constructed below, above or in replacement of the existing footing. The beam then transfers the load of the building to mass concrete bases, which are constructed at designed strategic ...
For a small to medium project, the cost and time of hiring mixing equipment, labour, plus purchase and storage for the ingredients of concrete, added to environmental concerns (cement dust is an airborne health hazard) [10] may simply be not worthwhile when compared to the cost of ready-mixed concrete, where the customer pays for what they use ...
The most common form of concrete is Portland cement concrete, which consists of mineral aggregate (generally gravel and sand), portland cement and water. After mixing, the cement hydrates and eventually hardens into a stone-like material. When used in the generic sense, this is the material referred to by the term "concrete".
A grade beam or grade beam footing is a component of a building's foundation. It consists of a reinforced concrete beam that transmits the load from a bearing wall into spaced foundations such as pile caps or caissons. [1] It is used in conditions where the surface soil's load-bearing capacity is less than the anticipated design loads.
The dry concrete plug was not introduced to the design until 1926. [2] Before this innovation, the casing had to be top-driven and equipped with a lost bottom plate. [ 1 ] The Franki pile with vibrated shaft and hydraulic vibrating hammer were manufactured starting from 1960 and 1971 respectively.