Search results
Results From The WOW.Com Content Network
Typically, the garage is on one side of the house and there is a floor above the garage housing the bedrooms. The other half of the house is the main living area, part of a story above the garage level and part of a story below the bedroom level. Grading or steps connect the exterior street to the front door on the main level.
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Help; Learn to edit; Community portal; Recent changes; Upload file
The Red House was constructed in 1929 at Barangay Anyantam under the orders of Don Ramon Ilusorio of the Ilusorio family, who owned vast hacienda lands in the area. [4] It was made largely out of wood and painted red on the outside giving it its name. The house was surrounded by large gardens filled with tamarind, camachile, and duhat trees.
The two houses of Congress meet at different places in Metro Manila, the seat of government: the Senate meets at the GSIS Building, the main office of the Government Service Insurance System (GSIS) in Pasay, while the House of Representatives sits at the Batasang Pambansa Complex in Quezon City. The two are around 25 kilometers (16 mi) apart.
The Metro Manila Subway, [7] formerly known as the Mega Manila Subway (MMS) is an under-construction underground rapid transit line in Metro Manila, Philippines.The 33-kilometer (21 mi) line, which will run north–south between Valenzuela, Quezon City, Pasig, Taguig, Parañaque and Pasay, consists of 17 stations between the East Valenzuela and Bicutan stations.
The Light Rail Transit Line 2, also known as LRT Line 2, LRT-2, or Megatren, is a rapid transit line in Metro Manila in the Philippines owned and operated by the Light Rail Transit Authority (LRTA). The line generally runs in an east–west direction between Recto in Manila and Antipolo. The line is officially referred to as the Purple Line.
Line 3's rolling stock has a three-car length of 95.16 meters (312 ft 2 in), with each car having a length of 31.72 meters (104 ft 1 in) and a width of 2.5 meters (8 ft 2 in). The first-generation cars (numbered from either 000 or 3000), built by ČKD Tatra in Prague , Czech Republic , are currently being used in the system.
Line 2 on the other hand, runs 10 trains at most with a minimum headway of 5 minutes. [10] With the proper upgrades, Line 1 is designed to potentially run with headway as low as 1.5 minutes. [11] Line 2 can run with headway as low as 2 minutes with throughput of up to 60,000 passengers per hour per direction (pphpd). [12]