Ads
related to: railroad ties length and weight comparison pictures for wood screws
Search results
Results From The WOW.Com Content Network
The crosstie spacing of mainline railroad is approximately 19 to 19.5 inches (48 to 50 cm) for wood ties or 24 inches (61 cm) for concrete ties. The number of ties is 3,250 wooden crossties per mile (2,019 ties/km, or 40 ties per 65 feet) for wood ties or 2,640 ties per mile for concrete ties. [3] [42] [43]
A chair screw (also known as coach screw [16]) is a large (~6 in or 152 mm length, slightly under 1 in or 25 mm diameter) metal screw used to fix a chair (for bullhead rail), baseplate (for flat bottom rail) or to directly fasten a rail.
A railway track (CwthE and UIC terminology) or railroad track (NAmE), also known as permanent way (CwthE) [1] or "P Way" (BrE [2] and Indian English), is the structure on a railway or railroad consisting of the rails, fasteners, sleepers (railroad ties in American English) and ballast (or slab track), plus the underlying subgrade.
Axe ties are railway ties (or sleeper) [1] that are hewn by hand, usually with a broadaxe.There are 2,900 ties per mile of track on a first class railroad. [clarification needed] The early railways would not accept ties cut with a saw, as it was claimed that the kerf of the saw splintered the fibres of the wood, leaving them more likely to soak up moisture causing premature rot.
The traditional form of grooved rail is the girder guard section illustrated to the left. This rail is a modified form of flanged rail and requires a special mounting for weight transfer and gauge stabilisation. If the weight is carried by the roadway subsurface, steel ties are needed at regular intervals to maintain the gauge.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!