Search results
Results From The WOW.Com Content Network
Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]
Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast beams, and wall panels, floors, roofs, and piles.
Studcast walls are prefabricated, ready-to-erect, high-performance concrete walls that weigh half as much as standard concrete walls. A hybrid between architectural precast concrete and panelized light-gage cold-formed steel framing, studcast walls combine the best features of each material in a way nullifies each material's weaknesses.
[32] [36] Solidia Technologies fires its brick and precast concrete at lower temperatures and cures them with CO 2 gas, claiming to reduce its carbon emissions by 30%. [32] [36] Carbonaide uses carbon dioxide in the curing phase of precast concrete production and has demonstrated up to 40% savings in cement consumption with their first client. [39]
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place ...
Reinforced concrete can be classified as precast or cast-in-place concrete. Designing and implementing the most efficient floor system is key to creating optimal building structures. Small changes in the design of a floor system can have significant impact on material costs, construction schedule, ultimate strength, operating costs, occupancy ...
In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...
The Bison wall-frame construction system was a construction method used in tower block construction. It was launched in 1963 by Concrete Ltd who set up factories across the UK to pre-fabricate the parts it. It was not a frame structure as such, instead precast concrete panels formed the structure of high rise blocks.