Search results
Results From The WOW.Com Content Network
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
Full Load hour is a measure of the degree of utilisation of a technical system. [1] [2] [3] Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.
The buyer's installment payments will remain the same (or fairly close to the same) through the contract, but the portion of the payment going towards ownership of the property will increase to 100% over time as the portion going to pay rent/lease decreases to 0% — the decrease in rent/lease reflecting the decrease in the bank's equity of the ...
Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.
Load factor (electrical), the average power divided by the peak power over a period of time; Capacity factor, the ratio of actual energy output to the theoretical maximum possible in a power station; Passenger load factor, the ratio of revenue passenger miles to available seat miles of a particular transportation operation (e.g. a flight)
Load cell, a transducer that is used to create an electrical signal; Load factor (computer science), the ratio of the number of records to the number of addresses within a data structure; Load factor (electrical), the average power divided by the peak power over a period of time; Load file, the file used to import data into a database or to ...
Language links are at the top of the page. Search. Search
The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.