When.com Web Search

  1. Ads

    related to: concrete resurfacing cost per square foot abbreviation chart

Search results

  1. Results From The WOW.Com Content Network
  2. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...

  3. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    An abbreviation used in parts lists (PLs, LMs, BoMs) in the quantity-per-assembly field when a discrete count is not applicable. For example, in an assembly with a bolted joint using four bolts, the PL quantity column will say "4" for the bolt PN, "4" for the nut PN, and "AR" for the liquid threadlocker that will be applied.

  4. Gypsum concrete - Wikipedia

    en.wikipedia.org/wiki/Gypsum_concrete

    Gypsum concrete is lightweight and fire-resistant. A 1.5-inch slab of gypsum concrete weighs 13 pounds per square foot versus 18 pounds per square foot for regular concrete. [10] Even though gypsum concrete weighs less, it still has the same compressive strength as regular concrete, based on its application as underlayment or top coat flooring ...

  5. Cost estimate - Wikipedia

    en.wikipedia.org/wiki/Cost_estimate

    A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. A cost ...

  6. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  7. Concrete - Wikipedia

    en.wikipedia.org/wiki/Concrete

    The monolithic placement consisted of 225,000 square feet (20,900 m 2) of concrete placed in 30 hours, finished to a flatness tolerance of F F 54.60 and a levelness tolerance of F L 43.83. This surpassed the previous record by 50% in total volume and 7.5% in total area. [162] [163]

  8. Types of concrete - Wikipedia

    en.wikipedia.org/wiki/Types_of_concrete

    The parts are in terms of weight – not volume. For example, 1-cubic-foot (0.028 m 3) of concrete would be made using 22 lb (10.0 kg) cement, 10 lb (4.5 kg) water, 41 lb (19 kg) dry sand, 70 lb (32 kg) dry stone (1/2" to 3/4" stone). This would make 1-cubic-foot (0.028 m 3) of concrete and would weigh about 143 lb (65 kg). The sand should be ...

  9. Ready-mix concrete - Wikipedia

    en.wikipedia.org/wiki/Ready-mix_concrete

    The output obtained from a site mix concrete plant using a 8/12 mixer is 4 to 5 metric cubes per hour which is 30-60 metric cubes per hour in a ready mix concrete plant. Better handling and proper mixing practice will help reduce the consumption of cement by 10 – 12%.

  1. Ad

    related to: concrete resurfacing cost per square foot abbreviation chart