Search results
Results From The WOW.Com Content Network
Natick officials have started the process of removing the Charles River Dam, which is expected to cost about $1.5 million.
The dam controls the surface level of the river basin as well its tributaries upstream, including the Back Bay Fens and Muddy River and to prevent sea water from entering the Charles River freshwater basin during high tides. It replaced the 1910 Charles River Dam upstream, now the site of the Boston Museum of Science. The 1910 dam includes two ...
Site of a ferry established in 1630; [2] obsoleted by the Charles River Bridge, built 1786 (New) Charles River Dam: pedestrians and bikers 1978 Fish ladder, pumps and three locks for navigation. Site of the Warren Bridge, built 1828, demolished 1962.
Nearly 1,000 people weighed in on community use and recreation near Natick's Charles River Dam, with many wanting to see improved public access.
Name State River Reservoir Height Storage capacity Capacity ()ft m acre.ft km 3; Bagnell Dam: MO: Osage: Lake of the Ozarks: 148 45 1,927,000 2.377 215: Boysen Dam
The lower 9-mile (14 km) portion of the watershed known as the "Charles River Basin" was created in 1910 with the construction of a dam across the mouth of the river. There was no dependable means of discharging river flood flows into Boston Harbor, since the dam relied on gravity flow with the sluice gates operating only at low tide.
Extreme fire behavior, including "short and long-range spotting," continues to challenge firefighting efforts, Cal Fire said in an incident update Wednesday. The fire was listed as "0%" contained.
The park is part of the "lost half mile" of the Charles River, between the 1910 Charles River Dam, now the site of the Museum of Science, and the new Charles River Dam completed in 1978. The park opening was delayed for several years by a number of logistical and bureaucratic issues, but its design, including small islands, bridges and kayaking ...