Ads
related to: generator rewinding near me prices installed cost
Search results
Results From The WOW.Com Content Network
New York has 2,192 MW of installed wind power capacity as of 2022. [1] Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes.
The generator, which is approximately 34% of the wind turbine cost, includes the electrical generator, [64] [65] the control electronics, and most likely a gearbox (e.g., planetary gear box), [66] adjustable-speed drive, or continuously variable transmission [67] component for converting the low-speed incoming rotation to high-speed rotation ...
Fuel consumption is the major portion of diesel plant owning and operating costs for power applications, whereas capital cost is the primary concern for backup generators. Specific consumption varies, but a modern diesel plant will, at its near-optimal 65-70% loading, generate at least 3 kWh per liter (ca. 30% fuel efficiency ratio). [6] [7]
It is based on an induction generator with a multiphase wound rotor and a multiphase slip ring assembly with brushes for access to the rotor windings. It is possible to avoid the multiphase slip ring assembly, but there are problems with efficiency, cost and size. A better alternative is a brushless wound-rotor doubly fed electric machine. [12]
The cost of a electricity production depends on costs during the expected lifetime of the generator and the amount of electricity the generator is expected to produce over its lifetime. The levelized cost of electricity (LCOE) is the average cost in currency per energy unit, for example, EUR per kilowatt-hour or AUD per megawatt-hour. [3]
A prototype was installed at Port of Rotterdam, producing 288 MWh in 24 hours in February 2020, [32] and a 14 MW prototype started there in October 2021. [33] Plans in September 2020 called for a new upgraded version of 13 MW GE Haliade-X turbine to be installed at Dogger Bank Wind Farm by 2023, [34] [35] [36] and DNV-certified in late 2022. [37]