When.com Web Search

  1. Ads

    related to: how to crimp aluminum downspout caps to wood anchor kit for concrete slab

Search results

  1. Results From The WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    The anchor selection, together with additional reinforcement, and rigging arrangements is influenced by: - The dead weight of the element - The number of anchors in the element and the configuration of the anchor - Capacity of the anchor at the specific concrete compressive strengths at time of lift - The dynamic loads applied during lifting ...

  4. Crimp (joining) - Wikipedia

    en.wikipedia.org/wiki/Crimp_(joining)

    Crimp tool for 0.14 mm 2 to 10 mm 2 (26–8 AWG) insulated and non-insulated ferrules. Crimping is a method of joining two or more pieces of metal or other ductile material by deforming one or both of them to hold the other. The bend or deformity is called the crimp. [1] [2] Crimping tools are used to create crimps.

  5. Leader head - Wikipedia

    en.wikipedia.org/wiki/Leader_Head

    Copper Leader Head at Penn's Quadrangle, Philadelphia 1894 Copper Leader at Shofuso Japanese House and Garden in Philadelphia. The purpose of a leader head is to help transfer excess water from the roof onto downspouts, thus preventing the gutters from overflowing and water washing over the walls, which is a common occurrence in areas susceptible to heavy rain cycles.

  6. Anchor bolt - Wikipedia

    en.wikipedia.org/wiki/Anchor_bolt

    In this case, concrete base material might be undamaged. Pull-out: the anchor is pulled out from the drilled hole partially damaging the surrounding concrete. When the concrete is damaged the failure is also indicated as pull-through. Concrete cone: after reaching the load-bearing capacity a cone shape is formed.

  7. Tieback (geotechnical) - Wikipedia

    en.wikipedia.org/wiki/Tieback_(geotechnical)

    Grouted tiebacks can be constructed as steel rods drilled through a concrete wall out into the soil or bedrock on the other side. Grout is then pumped under pressure into the tieback anchor holes to increase soil resistance and thereby prevent tiebacks from pulling out, reducing the risk for wall destabilization.