It is a method to deliver a project in which the design and construction services are contracted by a single entity known as the design–builder or design–build contractor. It can be subdivided into architect-led design–build ( ALDB , sometimes known as designer-led design–build ) and contractor-led design–build .
Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project. Design–bid–build is the ...
Design–build–finance–operate-maintain (DBFOM) [10] [11] also referred to as Design–build–finance–maintain-operate (DBFMO) [12] [13] is a project delivery method very similar to BOOT except that there is no actual ownership transfer. Moreover, the contractor assumes the risk of financing until the end of the contract period.
The EPC contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. They may or may not undertake actual site work. EPC companies are often used in large-scale projects, such as power plants, refineries, chemical processing facilities, infrastructure projects, and ...
If speed is important, design and construction contracts can be awarded separately; bidding takes place on preliminary plans in a not-to-exceed contract instead of a single firm design-build contract. The major problem [11] with design-build contracts is an inherent conflict of interest. In a standard contract the architect works for the owner ...
With the traditional design–bid–build process, a complete set of construction documents and specifications describes what the builder agrees to build and serves as the heart of the contract. On Fast-track projects, the design, construction documents and specifications are incomplete, so setting the final cost presents problems.
Design-bid-build is the most common and well-established method of construction procurement. In this arrangement, the architect , engineer or builder acts for the client as the project coordinator. They design the works, prepare specifications and design deliverables (models, drawings, etc.), administer the contract, tender the works, and ...
Early contractor involvement (ECI) is a type of construction contract where the principal contractor is engaged at an early stage in a project to offer input into the design phase. It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase.