Ads
related to: residential lightweight steel framing systems for homes home depotgensteel.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
Interior partition walls made with cold-formed steel. Cold-formed steel frames are also known as lightweight steel framing (LSF). Thin sheets of galvanized steel can be cold formed into steel studs for use as a structural or non-structural building material for both external and partition walls in both residential, commercial and industrial construction projects (pictured).
Architects, engineers and builders found it difficult to compare rated capacities and to use fully the economies of steel joist construction. Gable steel joists being erected. Members of the industry began to organize the institute, and in 1928 the first standard specifications were adopted, followed in 1929 by the first load table. The joists ...
Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a
The staggered truss system is a type of structural steel framing used in high-rise buildings. The system consists of a series of story-high trusses spanning the total width between two rows of exterior columns and arranged in a staggered pattern on adjacent column lines. [ 1 ]
Cold-formed steel framing (CFSF) refers specifically to members in light-frame building construction that are made entirely of sheet steel, formed to various shapes at ambient temperatures. The most common shape for CFSF members is a lipped channel, although "Z", "C", tubular, "hat" and other shapes and variations have been used.
Their sturdy steel frame was constructed on-site and the house was assembled piece-by-piece from a special Lustron Corporation delivery truck. The assembly team, who worked for the local Lustron builder-dealer, followed a special manual from Lustron and were supposed to complete a house in 360 man-hours.