Search results
Results From The WOW.Com Content Network
In a completed well, there may be many annuli. The 'A' annulus is the void between the production tubing and the smallest casing string. The 'A' annulus can serve a number of crucial tasks, including gas lift and well kills. A normal well will also have a 'B' and frequently a 'C' annulus, between the different casing strings.
In this well, the outside casing of the 'B' annulus is 13 + 3 ⁄ 8 in (340 mm) N80 grade with a weight of 68 lb⋅ft (92 N⋅m) −1. The burst pressure of this casing is 5020 psi. 1.2 sg brine produces a pressure gradient of 0.52 psi.ft −1 (see Well kill for the mathematical basics of hydrostatic heads). Therefore, the column of brine ...
Production casing is the final casing string set in a well and usually reaches from the surface to Target Depth (TD). The type of casing used depends upon the different conditions in the well. Commonly, production casing sizes range from 4 + 1 ⁄ 2 in (110 mm) to as large as 9 + 5 ⁄ 8 in (240 mm). It is the last string cemented in a well ...
Annular capacity (bbl/ft) = (ID hole 2 - OD pipe 2) / 1029.4. where ID hole 2 = Inside diameter of the casing or open hole in inches OD pipe 2 = Outside diameter of the pipe in inches. Similarly Annular volume (bbls) = Annular capacity (bbl/ft) × length (ft) and Feet occupied by volume of mud in annulus = Volume of mud (bbls) / Annular ...
Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface. Single-well alternate completions: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers.
The pressure is imposed on the walls of the hole. The hydrostatic fluid column accounts for most of the pressure, but the pressure to move fluid up the annulus also acts on the walls. In larger diameters, this annular pressure is small, rarely exceeding 200 psi (13.79 bar). In smaller diameters, it can be 400 psi (27.58 bar) or higher.
Well cementing is the process of introducing cement to the annular space between the well-bore and casing or to ... The smaller size of ... E. B. (1990). Well ...
High volume wells, for example, that are produced both up the tubing and annulus will not include a packer. Rod pumped wells are not normally run with packers because the associated gas is produced up the annulus. In general, well completions may not incorporate a packer when the annular space is used as a production conduit.