Ads
related to: schematics of a leach field construction plans drawing free toolcapterra.com has been visited by 10K+ users in the past month
stackct.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
A septic drain field, a septic tank, and associated piping compose a septic system. The drain field typically consists of an arrangement of trenches containing perforated pipes and porous material (often gravel) covered by a layer of soil to prevent animals (and surface runoff) from reaching the wastewater distributed within those trenches. [1]
Site plans are often prepared by a design consultant who must be either a licensed engineer, architect, landscape architect or land surveyor". [3] Site plans include site analysis, building elements, and planning of various types including transportation and urban. An example of a site plan is the plan for Indianapolis [4] by Alexander Ralston ...
Unlike the traditional septic system, the aerobic treatment system produces a high quality secondary effluent, which can be sterilized and used for surface irrigation. This allows much greater flexibility in the placement of the leach field, as well as cutting the required size of the leach field by as much as half. [1]
Plans are usually "scale drawings", meaning that the plans are drawn at specific ratio relative to the actual size of the place or object. Various scales may be used for different drawings in a set. For example, a floor plan may be drawn at 1:50 (1:48 or 1 ⁄ 4 ″ = 1′ 0″) whereas a detailed view may be drawn at 1:25 (1:24 or 1 ⁄ 2 ...
Whereas in a conventional hand drawn technical drawing, if a mistake is found, or a modification is required, a new drawing must be made from scratch, the 2D CAD system allows a copy of the original to be modified, saving considerable time. 2D CAD systems can be used to create plans for large projects such as buildings and aircraft but provide ...
These drawings are often a set of detailed drawings used for construction projects; it is a requirement for all HVAC work. They are based on the floor and reflected ceiling plans of the architect. After the mechanical drawings are complete, they become part of the construction drawings, which is then used to apply for a building permit.