When.com Web Search

  1. Ads

    related to: how to calculate gas marks needed for concrete block repair patch

Search results

  1. Results From The WOW.Com Content Network
  2. Concrete pavement restoration - Wikipedia

    en.wikipedia.org/wiki/Concrete_Pavement_Restoration

    CPP and CPR methods, developed over the last 40 years, are used in lieu of asphalt overlays and bituminous patches to repair roads when longer lasting solutions are desired. When installing pavers over top of an existing asphalt of concrete pad, there are three installation options: sand set, bituminous set, and mortar set. [1]

  3. Concrete degradation - Wikipedia

    en.wikipedia.org/wiki/Concrete_degradation

    Repair principles which do not improve the strength or performance of concrete beyond its original (undamaged) condition include replacement and restoration of concrete after spalling and delamination; strengthening to restore structural load-bearing capacity; and increasing resistance to physical or mechanical attack.

  4. Autoclaved aerated concrete - Wikipedia

    en.wikipedia.org/wiki/Autoclaved_aerated_concrete

    [citation needed] It is most suitable for producing a lightweight or most cost-effective alternative to traditional concrete blocks and clay bricks. [1] AAC products are manufactured offsite, as opposed to cellular concrete which is typically mixed and placed onsite. [citation needed] AAC is composed from a combination of quartz sand, gypsum ...

  5. Patch test (finite elements) - Wikipedia

    en.wikipedia.org/wiki/Patch_test_(finite_elements)

    A broader definition of patch test (applicable to any numerical method, including and beyond finite elements) is any test problem having an exact solution that can, in principle, be exactly reproduced by the numerical approximation. Therefore, a finite-element simulation that uses linear shape functions has patch tests for which the exact ...

  6. Dutchman (repair) - Wikipedia

    en.wikipedia.org/wiki/Dutchman_(repair)

    A rail repair dutchman is typically a 4–6-inch (100–150 mm) long piece of rail that is cut in advance for the purpose and carried by a section crew. If the gang finds a rail with a chipped or broken end, they remove the connector plates ( fishplates ), cut out the damaged section, replace it with the dutchman, and bolt the connectors back ...

  7. Concrete slump test - Wikipedia

    en.wikipedia.org/wiki/Concrete_slump_test

    The test is carried out using a metal mould in the shape of a conical frustum known as a slump cone or Abrams cone, that is open at both ends and has attached handles.The tool typically has an internal diameter of 100 millimetres (3.9 in) at the top and of 200 millimetres (7.9 in) at the bottom with a height of 305 millimetres (12.0 in).The cone is placed on a hard non-absorbent surface.