Search results
Results From The WOW.Com Content Network
The Boeing 737 MAX airliner, which began service in 2017, was involved in two fatal accidents, Lion Air Flight 610 on October 29, 2018, and Ethiopian Airlines Flight 302 on March 10, 2019, that resulted from a malfunction of the aircraft's new flight stabilizing software, [1] the Maneuvering Characteristics Augmentation System (MCAS).
FAA EAD grounding of Boeing 737 MAX 9 with door plug installed: January 6, 2024; Duration: between accidents: 4 months and 10 days; of grounding by the FAA: 1 year, 8 months and 5 days (619 days) 2024 737 MAX 9 grounding: 20 days; Cause: 2019-2021 grounding: Airworthiness revoked after second fatal accident caused by flight control failure
The Boeing 737 Max 9’s grounded several weeks ago will be back in the air soon after each passes inspection guidelines set by the FAA. Here’s what you need to know. ... 800-290-4726 more ways ...
On January 6, 2024, the FAA issued an EAD grounding all Boeing 737 MAX 9 aircraft for inspections, following an incident one day earlier on Alaska Airlines Flight 1282 where a door plug blew out while the flight was underway, leading to uncontrolled decompression of the cabin and subsequent emergency landing of the aircraft involved. [9]
Two fatal crashes of the 737 Max in late 2018 and early 2019 that killed 346 people were tied to a design flaw in the plane and led to a 20-month grounding of Boeing’s best-selling model. It had ...
The grounding of the Boeing 737 Max 9 is just the latest in the saga of the company’s troubles. The Boeing Max 8 was grounded in 2019 following two crashes, in 2018 and 2019, that killed a total ...
“Once the FAA approves an inspection and maintenance process, it will be required on every grounded 737-9 MAX prior to future operation.” Cruising Altitude: 4 tips for a safe airplane evacuation
As non-U.S. countries and airlines began grounding the 737 MAX, Boeing stated: "at this point, based on the information available, we do not have any basis to issue new guidance to operators." [40] Boeing said "in light of" the Ethiopian Airlines crash, the company would privatize [41] the roll-out ceremony for the first completed Boeing 777X. [42]