Search results
Results From The WOW.Com Content Network
There are 30 miles (48 km) of cross-county ski/hiking trails, 12 miles (19 km) of mountain biking trails and 9 miles (14 km) of equestrian trails. 6 miles (9.7 km) of the North Country Trail pass through the park. 30 miles (48 km) or more of seasonal two lane roads open to any road legal vehicles and is a popular destination for Enduro Riders.
The El Cid Historic District is a U.S. historic district (designated as such on August 31, 1995) located in West Palm Beach, Florida. The district is bounded by Flamingo Drive, South Flagler Drive, Dyer Road and South Dixie Highway. It contains 281 historic buildings.
The segment of road located in Pompano Beach is maintained by the city as of 2016, and is not part of the state highway system. [ 7 ] While the SR 811 designation ends at Hillsboro Boulevard, a short signed segment of CR 811 continues north for 0.4 miles (0.64 km) to a bridge over the Hillsboro Canal , which separates Palm Beach and Broward ...
State Road 704 (SR 704), also known as Okeechobee Boulevard, is a 10.199-mile-long (16.414 km) east–west boulevard in the West Palm Beach area, known for being dangerous to pedestrians and bicyclists. [2]
Devil's Den is formed by a karst window, in which the roof over a subterranean river has collapsed, exposing the water to the open surface, near Williston, Florida. It is privately owned and operated as a SCUBA diving training and recreational facility.
The “backbone" is another narrow, high cliff, 100 feet high and 6 feet across. It can be intimidating to cross over it, but it’s an adventure as well.
Devil's Den is the most frequently visited preserve (and largest contiguous preserve) run by the Connecticut chapter of the Nature Conservancy, with 40,000 visits per year. The main entrance is at the end of Pent Road in Weston.
It was Michigan's first state park to be situated in an urban area. Phase I of the park's development, which included refurbishing the marina and construction of the light tower, opened on May 20, 2004. Construction of the 6-acre (2.4 ha) Phase II, or expansion, phase of the project began in summer 2008 and concluded in summer 2009.