Completed falsework: Decking and some formwork has been added. The illustrations are of modern pipe-column falsework, used to support the formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge. When the supports are complete, wood beams and plywood or reusable ...
A wooden deck was then erected atop the falsework to support the lowest forming surface. Reinforcing for the lowest surface of the box structure was then added, and the concrete was poured. During the initial pour, reinforcing and formwork for interior shear beams and any included tendon conduits were added. Later, another concrete pour was ...
Partial failure under load of transport truck during severely cold temperatures. Fatigue fractures of three steel hanger rods cited to be primary reason for failure. 0 killed, 0 injured Partial failure of bridge deck. Overhead superstructure undamaged. Bridge reopened after complete reconstruction.
This is a list of structural failures and collapses of buildings and other structures including bridges, dams, and radio masts/towers. This is a dynamic list and may never be able to satisfy particular standards for completeness.
Shoring is designed to prevent collapse where shielding is only designed to protect workers when collapses occur. Concrete-structure and stone-building shoring, in these cases also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads.
Fifty-one people were killed in these failures, leading in the UK to the formation of the Merrison Committee [4] and considerable investment in new research into steel box girder behaviour. Most of the bridges still under construction at this time were delayed for investigation of the basic design principle.
Traditional formwork is fabricated using wood, but it can employ steel, glass fibre, reinforced plastics and other materials. [3] Formwork for beams takes the form of a box that is supported and propped in the correct position and level. The removal time for the formwork will vary with air temperature, humidity and consequent curing rate.
In Latin America, contractors have started to use a form of lift slab construction where load-bearing concrete walls are raised at the same time as the floor slabs. Both the wall panels and the floor slabs are cast on the ground. The walls are attached to the slabs through hinges formed by plastic ropes.