Search results
Results From The WOW.Com Content Network
An API well number or API number is a "unique, permanent, numeric identifier" assigned to each well drilled for oil and gas in the United States. [1] The API number is one of many industry standards established by the American Petroleum Institute. Custody of the API Number standard was transferred in 2010 to the PPDM Association.
WITSML is a standard for transmitting technical data between organisations in the petroleum industry. It continues to be developed by an Energistics facilitated Special Interest Group to develop XML standards for drilling, completions, and interventions data exchange. Organizations for which WITSML is targeted include energy companies, service ...
API also defines and drafts standards for measurement for manufactured products. Crude Oil Data Exchange (CODE) is the electronic business standard as of 1978. API RP 500 and RP 505 classify the locations for electrical equipment in hazardous areas. [14] [15] API has entered petroleum industry nomenclature in a number of areas: API gravity, a ...
An automated drill rig (ADR) is an automated full-sized walking land-based drill rig that drills long lateral sections in horizontal wells for the oil and gas industry. [8] ADRs are agile rigs that can move from pad to pad to new well sites faster than other full-sized drilling rigs. Each rig costs about $25 million.
APD – application for permit to drill; API – American Petroleum Institute: organization which sets unit standards in the oil and gas industry °API – degrees API (gravity of oil) APPRE – appraisal report; APS – active pipe support; APWD – annular pressure while drilling (tool) [5] ARACL – array acoustic log; ARESV – analysis of ...
Drill bit (#26) is a device attached to the end of the drill string that breaks apart the rock being drilled. It contains jets through which the drilling fluid exits. Drill floor (#21) is the area on the rig where the tools are located to make the connections of the drill pipe, bottom hole assembly, tools and bit. It is considered the main area ...
The Schramm T685 WS truck mounted drill bored a 5.5 inches (14 cm) hole that, on 22 August 2010, was the first to break through to the 33 trapped men, confirming they had survived the accident. [9] The company also manufactured the T130XD air core drilling rig owned by Geotec S.A., a Chilean-American joint venture drilling company.
The rig was originally built to meet the demand for a more powerful mobile drilling rig, specifically a demand for rigs capable of boring up to 260 feet (79 m) deep. [2] At the time, Big Stan was claimed to be the largest portable drill rig in the United States, [3] with some estimates placing it as the largest vehicle-mounted drill rig in the ...