Search results
Results From The WOW.Com Content Network
Manchester Metrolink [note 1] is a tram/light rail system in Greater Manchester, England. [11] The network has 99 stops along 64 miles (103 km) of standard-gauge route, [12] making it the most extensive light rail system in the United Kingdom. [13] Over the 2023/24 financial year 42 million passenger journeys were made on the system. [2]
Line Keys Color Hex color Icon; East Didsbury–Shaw (peak only) grey 867864: East Didsbury–Rochdale pink ef80b1: Manchester Airport–Victoria navy
From Manchester city centre, the route is shared with the Altrincham Line as far as Trafford Bar, and then the South Manchester Line as far as St Werburgh's Road. The Airport Line proper starts at a junction just south of St Werburgh's Road stop, where the line leaves the former railway trackbed, and runs off to the south-west.
Cornbrook tram stop, a major interchange on the Metrolink network. Since opening in 1992, the Manchester Metrolink light-rail/tram system has grown to a network of 99 tram stops. The system opened on 6 April 1992 with 10 tram stops from Manchester Victoria station to Bury, beginning Phase 1 of the network's expansion.
The Bury Line is a light rail/tram line on the Manchester Metrolink in Greater Manchester.It runs from Manchester Victoria station to Bury Interchange in the north. The entire line runs along a converted heavy rail line, and was reopened with the Altrincham Line, another Metrolink line converted from heavy rail, as part of Phase 1 of the Metrolink's expansion.
Audenshaw is a tram stop serving Audenshaw on the East Manchester Line (EML) of Greater Manchester's light-rail Metrolink system. The station opened on 9 October 2013 as part of Phase 3b of the system's expansion, [1] ahead of the originally-publicised schedule of the winter of 2013–14. [2]
Navigation Road is a station that serves both Northern Trains and Manchester Metrolink trams located in the east of Altrincham, in Greater Manchester, England.It consists of a Northern Trains-operated bidirectional heavy rail platform on the Mid-Cheshire Line opposite a bidirectional light rail platform on the Altrincham Line of Greater Manchester's Metrolink network.
27 July 2021: As over 20% of the Metrolink's workforce was off due to the COVID-19 pandemic, the enhanced service routes that operate during peak times to increase capacity (Altrincham–Bury, Shaw–East Didsbury etc.) could not do so, which forced the Metrolink to instead operate a Sunday service.