Search results
Results From The WOW.Com Content Network
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
As with other flared connection systems, the seal is achieved through metal-to-metal contact between the finished surface of the fitting nose and the inside diameter of the flared tubing. The sleeve is used to evenly distribute the compressive forces of the flare nut to the flared end of the tube.
They are commonly found between sections of buildings, bridges, sidewalks, railway tracks, piping systems, ships, and other structures. Building faces, concrete slabs, and pipelines expand and contract due to warming and cooling from seasonal variation, or due to other heat sources. Before expansion joint gaps were built into these structures ...
Flared connections offer a high degree of long-term reliability and for this reason are often used in mission-critical and inaccessible locations. The tool used to flare tubing consists of a die that grips the tube, and either a mandrel or rolling cone is forced into the end of the tube to form the flare by cold working.
Under tension loading, the concrete capacity of a single anchor is calculated assuming an inclination between the failure surface and surface of the concrete member of about 35°. The concrete cone failure load N 0 {\displaystyle N_{0}} of a single anchor in uncracked concrete unaffected by edge influences or overlapping cones of neighboring ...
The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.
A "active end anchorage of a prestressing tendon that has jacking operations undertaken at that end. [3]: 20 load balancing A prestressed concrete design method in which the prestressing forces exerted upon the member act to balance a given proportion of the service loads that the member will be subjected to. [1]: 38 longitudinal prestressing
The latest officially released version of MasterFormat is the 2018 Edition, which uses the following Divisions: PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP: