Search results
Results From The WOW.Com Content Network
A septic drain field, a septic tank, and associated piping compose a septic system. The drain field typically consists of an arrangement of trenches containing perforated pipes and porous material (often gravel) covered by a layer of soil to prevent animals (and surface runoff) from reaching the wastewater distributed within those trenches. [1]
The largest copper heap leach operations are in Chile, Peru, and the southwestern United States. Although heap leaching is a low cost-process, it normally has recovery rates of 60-70%. It is normally most profitable with low-grade ores. Higher-grade ores are usually put through more complex milling processes where higher recoveries justify the ...
If there is a suitable septic tank in place, pumping the effluent from the tank is the lowest cost option for initial costs. Whether the septic tank is the lowest cost option over time depends on the cost of electricity in the area, how often the tank must be emptied and how much it costs to have the solids pumped out of the tank.
Imhoff tank. a - upper chamber, b-c - outlet for sludge, d - outlet for biogas (would need to be higher), f - lower chamber, g - slot for sludge to pass from the upper to the lower chamber, h - height. The Imhoff tank, named for German engineer Karl Imhoff (1876–1965), is a chamber suitable for the reception and processing of sewage.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
The mound system was designed in the 1930s by the North Dakota College of Agriculture. [1] and was known as the Nodak Disposal System.In 1976, the University of Wisconsin studied the design of mound systems as part of the university's Waste Management Project.
It is critical for the volume of the sump to be able to store the expected leachate between pumping cycles. This relationship helps maintain a healthy operation. Sump pumps can function with preset phase times. If the flow is not predictable, a predetermined leachate height level can automatically switch the system on.
A site plan is a "set of construction drawings that a builder or contractor uses to make improvements to a property. Counties can use the site plan to verify that development codes are being met and as a historical resource.