When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Geometric design of roads - Wikipedia

    en.wikipedia.org/wiki/Geometric_design_of_roads

    The alignment is the route of the road, defined as a series of horizontal tangents and curves. The profile is the vertical aspect of the road, including crest and sag curves, and the straight grade lines connecting them. The cross section shows the position and number of vehicle and bicycle lanes and sidewalks, along with their cross slope or ...

  3. International roughness index - Wikipedia

    en.wikipedia.org/wiki/International_roughness_index

    The international roughness index (IRI) is the roughness index most commonly obtained from measured longitudinal road profiles. It is calculated using a quarter-car vehicle math model, whose response is accumulated to yield a roughness index with units of slope (in/mi, m/km, etc.).

  4. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    Grade is usually expressed as a percentage - converted to the angle α by taking the inverse tangent of the standard mathematical slope, which is rise / run or the grade / 100. If one looks at red numbers on the chart specifying grade, one can see the quirkiness of using the grade to specify slope; the numbers go from 0 for flat, to 100% at 45 ...

  5. Interstate Highway standards - Wikipedia

    en.wikipedia.org/wiki/Interstate_Highway_standards

    Pavement sloping: On straight sections of the highway, the roadway is to have a cross slope of at least 1.5%, and preferably 2% to ensure proper drainage, with up to 2.5% in areas of heavy rainfall. The cross slope of both the left and right shoulders should be between 2% and 6%, but not less than the main lanes.

  6. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  7. Topographic Abney level - Wikipedia

    en.wikipedia.org/wiki/Topographic_Abney_Level

    The scale is reversible. As shown in the photo, it is set for measuring percent grade. The reverse measures degrees of arc. An Abney level and clinometer is an instrument used in surveying which consists of a fixed sighting tube, a movable spirit level that is connected to a pointing arm, and a protractor scale. An internal mirror allows the ...

  8. Slope mass rating - Wikipedia

    en.wikipedia.org/wiki/Slope_mass_rating

    Slope mass rating (SMR) is a rock mass classification scheme developed by Manuel Romana [1] [2] [3] to describe the strength of an individual rock outcrop or slope. The system is founded upon the more widely used RMR scheme, [4] which is modified with quantitative guidelines to the rate the influence of adverse joint orientations (e.g. joints dipping steeply out of the slope).

  9. Drainage gradient - Wikipedia

    en.wikipedia.org/wiki/Drainage_gradient

    Typically on straight road sections, the drainage gradient is at least 1–3% due to the normal cross slope of 1–3%. In curved sections the drainage gradient is higher, and may often reach 5–12% due to superelevated CS that may reach 5–8% in areas with icy roads and up to 12% in areas without icy roads.