A utility pole, commonly referred to as a transmission pole, telephone pole, telecommunication pole, power pole, hydro pole, telegraph pole, or telegraph post, is a column or post used to support overhead power lines and various other public utilities, such as electrical cable, fiber optic cable, and related equipment such as transformers and ...
One Touch Make Ready (also known as One Touch, and often abbreviated as OTMR) is the various statutes and local ordinances passed by various local governments and utilities in the United States, which require the owners of utility poles to allow a single construction crew to make changes to multiple utility wires.
The oft cited figure of CA$14.319 billion – which works out to CA$4,077 per kW of capacity – includes interest (a particularly high cost in this case as the utility had to borrow at market rates and had to absorb the cost of delays in construction) and is thus not an "overnight cost".
An overhead power line is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (commonly multiples of three) suspended by towers or poles.
A three phase electric circuit terminated with a pothead Crossarms with two three phase electric circuits terminated with potheads. A pothead is a type of insulated electrical terminal used for transitioning between overhead line and underground high-voltage cable or for connecting overhead wiring to equipment like transformers. [1]
In electric power distribution, a service drop is an overhead electrical line running from a utility pole, to a customer's building or other premises. It is the point where electric utilities provide power to their customers. [1] The customer connection to an underground distribution system is usually called a "service lateral".
Above-ground lines cost around $10 per 1-foot (0.30 m) and underground lines cost in the range of $20 to $40 per 1-foot (0.30 m). [10] In highly urbanized areas, the cost of underground transmission can be 10–14 times as expensive as overhead. [11] However, these calculations may neglect the cost of power interruptions.
Transmission tower in Toronto, ON Single-circuit three-phase transmission line Transmission towers on a hill field. Three-phase electric power systems are used for high voltage (66- or 69-kV and above) and extra-high voltage (110- or 115-kV and above; most often 138- or 230-kV and above in contemporary systems) AC transmission lines.