In May 2012, TTC staff released a report saying that completion of the Eglinton Crosstown was unlikely by 2020 and that a more realistic in-service date would be 2022–2023. The main reason given was that the project management had been transferred from the TTC to Infrastructure Ontario, which uses the Alternative Finance and Procurement strategy.
Eglinton station is the only one of the original 1954 subway stations (Eglinton to Union on Line 1) to retain its original vitreous marble wall tiles. The other 1954 subway stations used similar wall tiles with variations in colour schemes, but at the other stations, the tiles were replaced because of deterioration.
Under the staff proposal, SmartTrack would be shortened to run from Mount Dennis in the west to Kennedy station in the east and have only four or five new stations. Staff would replace SmartTrack's western branch along Eglinton Avenue West to Pearson Airport by an expansion of the Eglinton Crosstown LRT.
In November 2017, the project was mostly unfunded, with the cost estimated at $1.6 to $1.7 billion, with an estimated completion date of 2023. [14] [17] At a November 2017 public meeting, city staff presented the possibility of extending the Eglinton East LRT by six stops to Malvern Town Centre.
Caledonia is an underground light rail transit (LRT) station under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. It will be located along Eglinton Avenue between the GO Transit Barrie rail corridor and the entrance to the Westside Mall.
The TTC did not indicate specific stops at the time of planning. [6] The Big Move indicates that the line would intersect mobility hubs at Eglinton, Don Mills, Steeles, and Highway 407, and facilitate transfers to the Eglinton Crosstown line, Line 4 Sheppard, the Sheppard East LRT, an LRT or BRT line on Steeles, the 407 Transitway, and the Highway 7 Rapidway.
Reconstruction between stations will be funded by the city and is proposed to be carried out after completion of the Crosstown line so that it does not interfere with the Metrolinx construction activity. [10] [11] A planning process called Eglinton Connects drew on public consultation to evaluate options for the redesign. [12]
The city would also raise property taxes annually over the next three years. Digging of the extension was expected to begin as early as 2018, with a completion within five years. [91] [92] As a result of the extension's approval, the Eglinton Crosstown line would be cut back to Kennedy station as its eastern terminus and renamed Line 5 Eglinton.