Search results
Results From The WOW.Com Content Network
Trimmers are installed parallel to the primary floor or ceiling joists and support headers, which run perpendicular to the primary joists. [1] [2] It can also refer to a jack stud that supports a header above a window or door opening. Traditionally, a stud which was less than full length was sometimes referred to as a cripple. [3] [4] [5]
Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a
Laminated veneer lumber detail. Laminated veneer lumber (LVL) is an engineered wood product that uses multiple layers of thin wood assembled with adhesives.It is typically used for headers, beams, rimboard, and edge-forming material.
The sub-floor plan provides construction details for this area, including the arrangement of services (such as plumbing and framing structures). Roof plans outline the type of roof and materials to use [4], its pitch and framing structure required. Interior elevation drawings provides detailed views of interior walls that showcase their design ...
An engineering drawing is a type of technical drawing that is used to convey information about an object. A common use is to specify the geometry necessary for the construction of a component and is called a detail drawing.
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built. Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings. The structural drawings are primarily concerned with the ...
An order from the engineering department (to be followed by the production department or vendor) overriding/superseding a detail on the drawing, which gets superseded with revised information. Also called by various other names, such as engineering change order (ECO), engineering change notice (ECN), drawing change notice (DCN), and so on.
Typical dimensions of today's "two by four" is 1.5 by 3.5 inches (38 mm × 89 mm) dimensional lumber prior to sanding and are typically placed 16 inches (406 mm) from each other's center, but sometimes also at 12 inches (305 mm) or 24 inches (610 mm).