Search results
Results From The WOW.Com Content Network
A typical PWR has fuel assemblies of 200 to 300 rods each, and a large reactor would have about 150–250 such assemblies with 80–100 tons of uranium in all. Generally, the fuel bundles consist of fuel rods bundled 14 × 14 to 17 × 17. A PWR produces on the order of 900 to 1,600 MW e. PWR fuel bundles are about 4 meters in length. [21]
There are about 179–264 fuel rods per fuel bundle and about 121 to 193 fuel bundles are loaded into a reactor core. Generally, the fuel bundles consist of fuel rods bundled 14×14 to 17×17. PWR fuel bundles are about 4 m (13 ft) long. In PWR fuel bundles, control rods are inserted through
These experimental designs (all of which shared the BWR-1 classification despite their divergent designs) used fuel rod bundles in 6×6, 7×7, 8×8, 9×9, 11×11, and 12×12 configurations, but GE's 9×9 bundle later used in BWR/2–6 reactors is different from the one used in the BWR/1 era. [2]
Average core power density, MW/m 3: 10.13 12.1 Fuel Sintered Natural UO 2 pellets Cladding tube material Zircaloy-2 Zircaloy-4 Fuel assemblies 3672 5096 4704 fuel bundles in 392 channels Number of fuel rods in assembly 19 elements in 3 rings 37 37 elements in 4 rings Enrichment of reload fuel 0.7% U-235 Fuel cycle length, Months 24 12 12
Each fuel bundle is a cylinder assembled from thin tubes filled with ceramic pellets of uranium oxide fuel (fuel elements). In older designs, the bundle had 28 or 37 half-meter-long fuel elements with 12–13 such assemblies lying end-to-end in a pressure tube. The newer CANFLEX bundle has 43 fuel elements, with two element sizes (so the power ...
Generally, the fuel bundles consist of fuel rods bundled 14x14 to 17x17. PWR fuel bundles are about 4 meters in length. The zirconium alloy tubes are pressurized with helium to try to minimize pellet cladding interaction which can lead to fuel rod failure over long periods. In boiling water reactors, the fuel is similar to PWR fuel except that ...
Average core power density, MW/m 3: 10.13 - 12.1 Fuel Sintered Natural UO 2 pellets Cladding tube material Zircaloy-2 Zircaloy-4 Fuel assemblies 3672 5096 4704 fuel bundles in 392 channels Number of fuel rods in assembly 19 elements in 3 rings 37 37 elements in 4 rings Enrichment of reload fuel 0.7% U-235 Fuel cycle length, Months 24 12 12
Average core power density, MW/m 3: 10.13 12.1 Fuel Sintered Natural UO 2 pellets Cladding tube material Zircaloy-2 Zircaloy-4 Fuel assemblies 3672 5096 4704 fuel bundles in 392 channels Number of fuel rods in assembly 19 elements in 3 rings 37 37 elements in 4 rings Enrichment of reload fuel 0.7% U-235 Fuel cycle length, Months 24 12